Projects & Experience

Projects

Proven Across Critical Infrastructure

With nearly fifteen years of industry experience, GEMIN has delivered complex and mission-critical projects for government institutions, utilities, industries, telecommunications operators and financial institutions.

Our portfolio demonstrates our ability to manage projects from design and procurement through installation, testing, commissioning and long-term maintenance.

10+

Data Centres Delivered

20+

ICT, Telecom & Security Projects

200+

Transformers Installed

30+

Security & Safety Projects

540 km

Of low-voltage power lines

80 km

Of medium-voltage power lines

214

Transformers installed within the featured electrification project

Powerlines Infrastructure Project

Powering Communities. Empowering Tomorrow.

GEMIN delivered the design, supply, construction, testing and commissioning of low- and medium-voltage distribution powerlines with associated transformers, improving electricity access, network reliability and capacity across the project areas.

Project achievements:

  • 540 KM of LV power lines
  • 80 KM of MV power lines
  • 214 transformers installed

Project scope:

  • Site survey
  • System design
  • Material and equipment supply
  • LV and MV line construction
  • Transformer installation
  • Testing and commissioning
  • Quality and safety compliance

Project impact:
The project expanded electricity access, strengthened network performance and supported community development, business growth and industrial activity.

Completed Projects

Airtel Tanzania

Project: Airtel Arusha Data Centre Power System
Location: Arusha Data Centre
Year: 2023
Solution: 128kW rectifier system with 3.2MWh BESS
Scope: Installation and system integration

National Insurance Corporation

Project: Nationwide Branch BESS Project
Location: Branches countrywide
Year: 2023
Solution: 200kWh BESS integrated with 50kVA inverters
Scope: Design, supply and installation

Bank of Africa

Project: Countrywide Banking Power Resilience Project
Location: Branches countrywide
Year: 2023
Solution: 880kWh BESS integrated with 56kVA inverters
Scope: Design, supply and installation

Tanzania Commercial Bank

Project: Dodoma Data Centre Backup Power
Location: Dodoma Data Centre
Year: 2025
Solution: 120kWh BESS integrated with a 36kVA inverter
Scope: Design, supply and installation

Tanzania Cigarette Company

Project: Critical Production Line UPS System
Location: Factory production line
Period: 2024–2026
Solution: 4.8MWh battery capacity supporting a 2.2MW UPS load
Scope: Installation and integration

Ongoing Projects

Tanzania Commercial Bank

Project: Countrywide Branch Energy Storage Project
Period: 2026–2027
Solution: 180kWh BESS integrated with a 72kVA inverter
Scope: Design, supply and installation

Tanzania Cigarette Company

Project: Industrial Solar Power Integration
Period: 2026–2027
Solution: 1.4MW grid-tied solar power system
Scope: Installation and integration with the existing factory power system

Twiga Cement

Project: Large-Scale Industrial Solar Project
Period: 2026–2027
Solution: 2.925MW grid-tied photovoltaic system
Scope: EPC delivery covering design, supply and installation